Silent Ball MOQ and Lead Time Explained
Short answerFor silent balls, the ODM minimum order is 1,000 pieces per model. If you already have a mold, production on your own tooling starts from 1 piece. Samples take 1-2 weeks; mass-production lead time is confirmed in the quotation.
Minimum order quantity
- ODM (we develop the product for you): 1,000 pieces.
- Your own mold: from 1 piece.
- Private label: logo and packaging on our product, with the MOQ confirmed per project.
Lead time
Sampling usually takes 1-2 weeks. Mass-production lead time depends on quantity, number of colors and packaging, so we confirm it in the quotation rather than quote a single number for every order.
How to plan a first order
Start with the sample, then decide quantity by model. Fewer colors and simpler packaging usually keep the schedule shorter.
FAQ
What is the MOQ for silent balls?
For ODM projects, where we develop the product for you, the MOQ is 1,000 pieces. With your own mold, production starts from 1 piece.
How long is mass-production lead time?
It depends on quantity, colors and packaging and is confirmed in the quotation after the sample is approved.
Need samples or a quote for silent balls?
